Availability: | |
---|---|
Quantity: | |
Scope of supply:
The main equipment includes: ① clay gun, opening machine and hydraulic equipment; ② Three kalukin hot blast stoves, equipped with combustion supporting air and double preheating system; ③ Furnace top equipment and main winch; ④ 8 distribution boxes, 1 large ash bin and 1 set of pneumatic ash conveying; ⑤ Trough vibrating screen and conveyor belt; ⑥ Crude gas system valve. The main equipment of public and auxiliary facilities includes: ① one set of BPRT fan av50-14 and AV45-12 units respectively; ② Lifting equipment: 3 sets of 125t crown block of cast iron machine, 2 sets of crown block in front of furnace and 3 sets of slag bailing crown block; ③ One set of environmental protection dust removal in front of furnace, ore trough and cast iron machine; ④ Several hot metal conveying vehicles and 65 t hot metal tanks; ⑤ Double chain cast iron machine 60m * 3 sets; ⑥ Clean circulating water system; ⑦ One set of air compression and nitrogen production equipment; ⑧ 2 gas release towers. PSA oxygen production 6250M ³/ H) one set of equipment. 7500m ³/ H) one set of equipment. One set of coal injection equipment (mill specification). One set of boiler gas power generation (specification).
Scope of supply:
The main equipment includes: ① clay gun, opening machine and hydraulic equipment; ② Three kalukin hot blast stoves, equipped with combustion supporting air and double preheating system; ③ Furnace top equipment and main winch; ④ 8 distribution boxes, 1 large ash bin and 1 set of pneumatic ash conveying; ⑤ Trough vibrating screen and conveyor belt; ⑥ Crude gas system valve. The main equipment of public and auxiliary facilities includes: ① one set of BPRT fan av50-14 and AV45-12 units respectively; ② Lifting equipment: 3 sets of 125t crown block of cast iron machine, 2 sets of crown block in front of furnace and 3 sets of slag bailing crown block; ③ One set of environmental protection dust removal in front of furnace, ore trough and cast iron machine; ④ Several hot metal conveying vehicles and 65 t hot metal tanks; ⑤ Double chain cast iron machine 60m * 3 sets; ⑥ Clean circulating water system; ⑦ One set of air compression and nitrogen production equipment; ⑧ 2 gas release towers. PSA oxygen production 6250M ³/ H) one set of equipment. 7500m ³/ H) one set of equipment. One set of coal injection equipment (mill specification). One set of boiler gas power generation (specification).